Warning: call_user_func_array() expects parameter 1 to be a valid callback, class 'AGPressGraph\manipulator' does not have a method 'httpsCanonicalURL' in /home/cfnrfm/public_html/wp-includes/class-wp-hook.php on line 286
Latest Headlines
Home / News / Nass River Bridge to get replacement

Nass River Bridge to get replacement

The Nass River Bridge on Highway 37 is getting a replacement.

A joint provincial and federal announcement says the single-lane timber bridge will be replaced with a two-lane concrete structure.

The bridge is about 13km south of the Meziadin Junction and 50km east of Stewart.

The project will cost approximately $24-million, with the province contributing about $13-million and the federal government contributing $10.5-million.

About CFNR Team

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: