Stewart RCMP are not happy over the results of a number of construction speed zone checks conducted over the last couple weeks.
5 separate checks were conducted between February 20th and March 2nd, with 33 drivers being caught speeding.
Crews are currently working to replace the Nass River Bridge on Highway 37, north of Kitwanga.
A 1.5 km construction zone is in place around the area.
Police say they are disappointed with the results and are reminding residents that they will be conducting regular patrols all summer long.