Warning: call_user_func_array() expects parameter 1 to be a valid callback, class 'AGPressGraph\manipulator' does not have a method 'httpsCanonicalURL' in /home/cfnrfm/public_html/wp-includes/class-wp-hook.php on line 286
Latest Headlines
Home / 2018 / Wolverine seeks input on environmental effects draft for refuelling project
Wolverine seeks input on environmental effects draft for refuelling project

Wolverine seeks input on environmental effects draft for refuelling project

The company proposing a marine refuelling project in Prince Rupert is looking for public feedback.

Wolverine Terminals has posted the preliminary document outlining the project’s possible impacts on the environment as it moves through the assessment process.

The draft Environmental Effects Evaluation (EEE) looks at everything from First Nations engagement to air and water quality, fish, noise, and visual effects.

A copy of the draft EEE is available online and a hard copy can be found at the Prince Rupert Port Interpretive Centre.

An open house is scheduled for March 21 from 4 p.m. to 8 p.m. at the Crest Hotel.

Public feedback on the draft evaluation can be made until April 11, 2018.

Wolverine says it expects regulatory approval in mid-2018 with construction to follow early in 2019.

About Bill Fee

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: